Skip to content
● Engineering response within 24 h admin@ingiant.com ISO 9001 · CE · RoHS
Ingiant Technology

Custom Engineering Process

How a custom slip ring project runs: requirements review, drawing and quotation in 1–3 days, prototype validation, production release.

Slip ring assembly workshop

Custom work is not a special department here — it is the default mode. This page describes how a custom slip ring, rotary union or turntable project actually runs, so you know what we need from you and what you will get back.

Step 1 — Requirements review (day 0–1)

Send any of the following, in any combination: circuits and their type (power, signal, shielded pair, Ethernet, fibre, RF), current per circuit, voltage, bore or outer diameter, overall length limit, rotation speed, number of rotations over life, IP rating, operating temperature, interface connectors, and annual volume. If you have an existing unit, a photo with a ruler in frame is enough to start.

Step 2 — Concept and quotation (day 1–3)

You receive an envelope drawing in PDF plus a STEP model when geometry is settled, a material and contact list, an honest statement of what is standard and what is new tooling, and a firm unit price with tooling separated. Where the requirement can be met by a standard family with a small variant, we say so — it is cheaper for both sides.

Step 3 — Prototype and validation (2–4 weeks)

Sample build with the full electrical test report, dimensional report and, where relevant, ingress and life testing. For offshore, medical and defence programmes this is where the qualification evidence is generated.

Step 4 — Production release

Batch production with 100% electrical test, serial traceability and a deviation list against the drawing. Packaging is export-grade; shipping is DHL or FedEx door-to-door for samples and consolidated sea freight for volume.

What we need upfront to quote accurately

  • Duty cycle: continuous rotation or indexed positioning, and cycles per year.
  • Environmental class: indoor, washdown, salt fog, subsea depth, vacuum, explosive atmosphere.
  • Mechanical interface: shaft or housing mount, bore pass-through requirements, available axial and radial space.
  • Signal integrity requirement: BER limit for Ethernet, insertion loss for fibre, crosstalk limit for RF.
  • Commercial frame: target price, annual volume, required lead time, destination Incoterm.

Confidentiality

NDAs are signed before drawings are exchanged, and we can work from an anonymised outline if your programme requires it. Customer drawings, models and test data are never reused for other customers.

Send us your drawing. We send back a design.

Circuits, current, bore size, IP rating, temperature — give us the parameters and our engineers return a feasibility note, drawing and quotation within 24 working hours.